Construction and trades tenders often ask for relevant project examples, a realistic programme, health and safety arrangements and how quality and defects are managed. Drafts often fall back on company capability statements instead of answering for this project.

Who it's for

  • Small contractors bidding for council, school or housing works
  • Specialist trades responding to frameworks
  • Bid writers preparing quality submissions

Common weak points

  • Case studies that don't match the scale or type of work
  • Programme described without sequence or contingency
  • Health and safety listed as policies instead of site arrangements
  • Defects and handover not addressed
  • Occupied-site issues (residents, pupils, public) ignored

Pre-submission review

What TenderChecker reviews

Plain-English feedback on buyer intent, gaps, missing evidence and improved wording. Document review and writing support — not legal or formal procurement advice.

Check 1

Whether each part of the question is covered

Check 2

Relevance of case studies to the work described

Check 3

Programme sequencing and risk wording

Check 4

Site health and safety and CDM duties the buyer asks about

Check 5

Quality, defects and handover arrangements

Example issues the buyer may mark down

Common patterns in this type of tender answer.

Case study doesn't fit

The example project is a different type of work, so it doesn't show the buyer what they asked to see.

No programme logic

The answer states the work will finish on time without showing the sequence or how delays are managed.

Defects not covered

The question asks about quality and handover; the answer stops at completion.

Weak vs stronger wording

Fictional example — housing refurbishment, delivery approach question.

Weak draft

We are an experienced contractor with a strong track record and will deliver the works safely, on time and to a high standard.

Stronger wording

Works will be sequenced [insert sequence, e.g. by block or property], with [insert contingency] built into the programme. Residents will be notified [insert timescale and method] before work starts. The site manager [insert name or role] carries out [insert checks] daily. Defects are recorded at handover using [insert method] and closed within [insert timescale]. A comparable project: [insert relevant example and outcome].

Fictional example. Replace each [placeholder] with facts you can verify — never invent figures.

Check your tender answer free

Paste one tender question and your draft answer. Get buyer intent, covered points, genuine gaps and a checked rewrite suggestion before you submit.

Frequently asked

Will the review tell me whether I will win?⌄

No. Nobody outside the evaluation panel can predict scores. The review shows where your answer doesn't clearly address the question or criteria, and where evidence is missing, so you can fix it before you submit.

What's the difference between the free check and the paid review?⌄

The free check looks at one question and one draft answer. The £49 review covers one tender: you get a review report and an improved, editable Word response within 24 hours of payment.