Topic hub

PQQ Response Help

Pre-qualification questionnaires (PQQs) and supplier questionnaires (SQs) are pass/fail compliance checks before any scored response is read.

Why it matters for UK SMEs

Most disqualifications happen at the PQQ or SQ stage and are avoidable. A short compliance check beats a strong written answer that never gets read.

Common weak points

  • Insurance certificates below the required minimum
  • Policies older than 12 months or unsigned
  • Expired accreditations referenced as current
  • Inconsistent figures between the SQ and accounts
  • Wrong legal entity referenced

Improvement checklist

  • Confirm company details match Companies House exactly
  • Verify all insurance minimums and dates
  • Re-sign and re-date policies as needed
  • Confirm accreditations are still valid
  • Match turnover and accounts figures across documents

Most relevant articles

  • The Difference Between PQQ and ITT Responses in UK Bids

    Confused by procurement stages? Learn the exact difference between PQQ and ITT responses in UK public sector tenders, including how to handle compliance evidence versus scored award method statements.

    27 October 2026 8 min

Check your tender answer free

Paste one tender question and your draft answer. Get buyer intent, covered points, genuine gaps and a checked rewrite suggestion before you submit.

Frequently asked

What is the difference between a PQQ and an SQ?⌄

PQQ is the older term; SQ is the current UK term following the standardised Selection Questionnaire format. The compliance discipline is the same.

Can a non-compliant PQQ be fixed after submission?⌄

Rarely. Most buyers reject non-compliant responses without scoring them.

Disclaimer

This page provides general document review and writing guidance. It is not legal advice, formal procurement advice, or a guarantee of tender success.